WINONA, Minn. — Staff training at the Bob Welch Aquatic Center has been completed for the long-awaited 2026 opening. Expect a line Tuesday for the event at 12:30 p.m. The opening couldn’t come too soon. A sweltering air mass of ultra-high humidity had settled into the region.with temperatures in the 90s
Earlier: Embarrassed city agency sets SMU as swim option